When London ambulance crews contact urgent community response, the most reported issues are not clinical. In the London MiDoS report for February 2026, unanswered phones (31 reports) and service capacity (30) were the top two out of 95 UCR feedback items. Patients end up in hospital not because the community could not care for them, but because no one could show there was room in time.
For the shift from hospital to community to work, referrers and crews need to see which services can take a patient now. That depends on capacity data they can trust.
The problem with manual returns
The Single Point of Access relied on each service submitting its capacity by hand, typically once a day. Returns were accurate when sent, but capacity changes all day. A status set at eight in the morning stood until the next day, long after visits had run long, finished early or been cancelled. Between submissions, referrers and ambulance crews were working from an old picture.
One day, two pictures of capacity
Illustrative day, not live dataDrag through the day. The manual return is right when it's sent at 08:00, then stays the same while the service's real capacity keeps changing.
One definition of capacity
Before anything was built, service leads from the four community providers agreed what each capacity status means: within two hours, within four hours, not accepting referrals, and outside shift. Those definitions became rules the tracker applies to every service in exactly the same way, so a status in one borough means the same in the next.
How the tracker works
The tracker calculates each service's capacity from the rota and clinicians' live availability in Doc Abode, and shares it as a single 24-hour view across five UCR services. Nobody types anything in.
It is deliberately not AI. It is simple arithmetic on seven data items the platform already holds, so anyone can check how a status was reached. That is what made it possible to audit, and why a system could trust it.
The audit
Rather than ask the system to trust the tracker, it was run alongside the manual process. For three weeks across three boroughs, every manual submission was compared with what the tracker showed at the moment the submission was made. All 158 matched, with no conflicts.
In the same window the tracker detected 923 capacity changes, around six times what manual reporting captured. It was not only as accurate as the manual process. It saw far more. The choice was not between a proven process and a risky one. It was between an out-of-date picture and an audited live one.
What each process saw in three weeks
Every one of the 158 manual returns matched the tracker at the moment it was sent. Conflicts: 0.
From agreement to decision
| When | What happened |
|---|---|
| 2025 to 2026 | Four-year, system-wide agreement across five boroughs and four community providers, with UCLPartners evaluation from day one |
| Before build | Service leads agree one set of capacity definitions |
| February 2026 | Tracker live and adopted as the single source of truth for the Single Point of Access |
| 13 April to 4 May 2026 | Three-week audit: 158 of 158 manual returns matched, 0 conflicts |
| 7 September 2026 | Manual capacity reporting switched off |
What comes next
The same trusted data now feeds Doc Abode's AI-written capacity reports on Amazon Bedrock, and analytics in Amazon Q in QuickSight. The AI is built on top of the tracker, not inside it.
- See (live): real-time capacity across every service in a system.
- Trust (live): automated tracking proven against every manual submission.
- Understand (live): AI analytics and reports on the same data.
- Predict (in development): forecasting demand by locality and pathway.
- Plan (in development): automated demand and capacity planning across a system.
Lessons for other systems
- Agree definitions first. Shared rules are what make capacity comparable across providers.
- Calculate, don't collect. Status worked out from data the services already record is always current.
- Run it alongside before switching off. An audit, not a demonstration, earned the decision.
We are happy to share the North Central London route, the audit method and the reports with any system that wants to try it.