The problem: proven, but not adopted
The NHS is not short of proven innovation. It is short of the ability to adopt it at pace. Doc Abode's results in Camden were measured by the Trust itself within months of going live in November 2022. Yet for most of the next three years, each new service still had to make the case again, one provider and one pilot at a time.
Care around one person is often delivered by several teams, employed by different organisations, working to different schedules and recorded on different systems. Each team sees some of its own work. Nobody sees the whole. Pilots in single services cannot fix that, because the problem sits between them.
The route North Central London took
North Central London chose to commission across the whole system instead. The route had five steps, and any system can follow it.
| Step | What it meant |
|---|---|
| 1. Propose | A proposal for support to the ICB |
| 2. Plan | A delivery plan across every provider |
| 3. Approve | Board approval |
| 4. Commit | A four-year agreement across all five boroughs and all four community providers, not another twelve-month pilot in one of them |
| 5. Evaluate | Independent evaluation by UCLPartners from day one, and an operational lead seconded into the ICB |
The length of the agreement mattered as much as its reach. Four years gave providers the confidence to change how they work, rather than run a trial alongside business as usual.
The journey, step by step
Select a milestoneWhat slowed it down, and what that teaches
A system-wide programme does not remove the friction of working across separate organisations. The rollout was planned to begin in September 2024 and was due to move through the trusts in sequence. In practice, implementation started in January and February 2025, and the order had to change when one provider's requirements changed.
None of the delays was about the technology. They came from:
- Limited IT capacity: trust IT teams were running many programmes at once.
- Different priorities: operational, digital, procurement and governance teams each had their own requirements, even with strong senior support.
- Repeated assurance: each trust needed its own clinical safety case, hazard log and DPIA, even though all of them share the same wider governance environment.
- Digital transformation fatigue: little internal capacity left for another change programme.
A trusted assessor model, where one trust's assurance is accepted by the others in the same system, would remove much of that duplication. It is the single change we would most recommend to any system starting the same journey.
What it has delivered
Productivity in individual services
Measured outcomes come from two trusts using two different clinical record systems. At Camden (CNWL), visits per clinician per shift rose from 2.9 to 6.4. At Islington (the Whittington), completed jobs per clinician per shift rose from 3.26 to 5.32, and two-hour response improved from 76% to 87%.
One definition of capacity
With every provider on one platform, service leads from all four could agree what each capacity status means: within two hours, within four hours, not accepting referrals and outside shift. Those rules are applied to every service in exactly the same way.
A live view for the Single Point of Access
That shared definition made the automated capacity tracker possible. It calculates each service's capacity from the rota and live availability, and shows it in one 24-hour view. It became the Single Point of Access's single source of truth in February 2026. A three-week audit matched all 158 manual returns with no conflicts, and manual capacity reporting was switched off on 7 September 2026.
A foundation for AI
The same audited data now feeds AI-written capacity reports on Amazon Bedrock and analytics in Amazon Q in QuickSight, for services, providers and commissioners. The next steps, forecasting demand by locality and pathway, and planning capacity across the system, build on it.
The scale of the prize
Independent modelling by UCLPartners estimates that coordinating urgent community response this way across London would release 146,212 bed-days a year and add 89,034 urgent-care contacts. An NHS England national case study cites 66,000 occupied bed-days saved a year.
bed-days released a year
more urgent-care contacts a year
Lessons for other systems
- Commission the system, not the service. Capacity problems sit between organisations, so the fix has to span them.
- Commit for long enough. A multi-year agreement lets providers change how they work rather than pilot alongside it.
- Build evaluation in from the start. Independent evidence answers the next system's questions before they are asked.
- Agree shared definitions early. One meaning of capacity is what makes a system-wide view possible.
- Plan for assurance, not just technology. A trusted assessor model would save months.
We are happy to share the North Central London route, the audit method and the reports with any system that wants to try it.
Sources: NCL ICB commissioning route; Doc Abode, barriers to adoption case study, 2026; Doc Abode automated capacity tracker, NCL implementation and audit, 13 April to 4 May 2026; CNWL Camden impact assessment, March 2023; Whittington Health Islington case study v5; UCLPartners modelling; NHS England, Standardising community health services.